Ppr pipe fittings and pipe fittings between the installation, should be hot-melt connection, and installation should use a dedicated hot-melt tools.
In the hot melt to power, to reach the operating temperature indicator light before they can begin operation. In cutting the village, the end surface table must be in the pipe axis, pipe cutting generally use pipe cut or pipe cutting machine, if necessary, can use sharp hacksaw, but after cutting the pipe section should be removed burrs and burrs. The connection end of the pipe shall be clean, dry and oil free, and the hot melt depth shall be measured and plotted at the pipe end with a caliper and a suitable pen. In the welding elbow or tee, according to the requirements of the design drawings, should pay attention to its side, gas pipe and pipe in the direction of the line, marked with auxiliary signs its location.
When the heating time is reached, the pipe and the pipe are removed from the heating sleeve and the heating head at the same time, so that the straight line can be inserted into the standard depth without rotation and the uniform flange is formed at the joint.
Shijiazhuang xing yin import and export trading Co.,Ltd
Address:5C,Diaoyutai palace,Jiankang Road,Changan District,shijiazhuang City
Tel:86-0311-86051722
Fax:86-0311-86051722
Whatsapp/Mob:86-15533994368
 
Email:david@pvcfittingssupplier.com
Skype:live:davidxingyin
www.pvcfittingssupplier.com

没有评论:

发表评论