Clamping piece fixing of PPR pipe fitting at installation time

Clamping piece fixing of PPR pipe fitting at installation time
PPR pipe fittings in connection, should use the same specifications of the bolt, the installation direction of the same, bolts should be symmetrical fastening, fastening bolts should be exposed outside, should be flush, bolt, nut should use galvanized parts.
But in the pipeline installation, should use pipe manufacturer supporting pipe support and hanger or pipe must be set according to different diameter and position requirements, should be accurate, buried should be smooth and firm; close pipe and pipe contact, but not to damage the surface of pipe. The use of metal stents, hanger or clamp, should adopt the saddle clamp flat iron making, and isolation using soft material in the pipe and pipe should not be used, made of round steel U clamp. The brackets and hangers should have sufficient stiffness, no deformation and other defects.
There is, PPR pipe and metal pipe connecting parts, clamp or support and hanger should be located in the end of metal pipe fittings.
Shijiazhuang xing yin import and export trading Co.,Ltd
Address:5C,Diaoyutai palace,Jiankang Road,Changan District,shijiazhuang City
Tel:86-0311-86051722
Fax:86-0311-86051722
Mob:86-15533994368
 
Email:david@pvcfittingssupplier.com
Skype:live:davidxingyin
www.pvcfittingssupplier.com

没有评论:

发表评论