2016年11月29日星期二

Construction and installation of PPR pipe fittings

Construction and installation of PPR pipe fittings
Be careful in handling PPR fittings, prohibited throwing, throwing, rolling, drag, according to different specifications of packaging and stacking, pipes in different specifications and varieties were packing.
The installation personnel should be familiar with the general properties of PPR type hot melt connection pipe, grasp the basic operation, and be familiar with design drawings, understand the relationship between the structure and technology layout of buildings and other works with each other. Prior to construction, to deal with the material and appearance and accessories, etc., to check the ban will be long-term exposure to the sun. Pipe through the wall, the board should be set at the tube, the inner diameter of the pipe should be larger than the diameter of the outer diameter of the 20mm, the flexible non combustible material. All buried in the ground or wall plate, concealed pipes, must first hydraulic test to landfill or closed rear test.
For pipe hanger selection, according to on-site installation, selection of pipe factory production of plastic pipe clamp.
Shijiazhuang xing yin import and export trading Co.,Ltd
Address:5C,Diaoyutai palace,Jiankang Road,Changan District,shijiazhuang City
Tel:86-0311-86051722
Fax:86-0311-86051722
Mob:86-15533994368
 
Email:david@pvcfittingssupplier.com
Skype:live:davidxingyin
www.pvcfittingssupplier.com

没有评论:

发表评论