After the installation of PPR pipe fittings how to do a good job of protection

After the installation of PPR pipe fittings how to do a good job of protection
During the installation of PPR pipe fittings, the opening of the pipeline should be sealed in time so as to prevent dirt and debris from entering the project.
Because the PPR pipe with soft texture, its mechanical strength without steel is high, so to prevent physical damage, after the installation is complete, no pipeline knock, touch, smashing, pressure, and should be covered in protective measures before concealment. Pipeline in the pipeline, in the absence of a closed to take certain measures to prevent bricks, debris, and so fell off the pipe smashed. Due to the composition of PPR pipe elements, to prevent chemical damage, installed in the outdoor or direct sunlight, to wrap the deep color of the protective layer, to prevent the sun exposure to the chemical destruction of the pipeline.
Also pay attention to the low temperature during the winter, PPR pipe if there is no good thermal insulation measures, it should be in time to blow the water in the pipeline, to prevent the pipeline from freezing.

Shijiazhuang xing yin import and export trading Co.,Ltd
Address:5C,Diaoyutai palace,Jiankang Road,Changan District,shijiazhuang City
Tel:86-0311-86051722
Fax:86-0311-86051722
Whatsapp/Mob:86-15533994368
 
Email:david@pvcfittingssupplier.com
Skype:live:davidxingyin
www.pvcfittingssupplier.com

没有评论:

发表评论