2016年10月11日星期二

PVC pipe fittings after the production of the work

PVC pipe fittings after the production of the work
After successful PVC pipe production, has been tested and qualified, what to do after the PVC pipe production success, the need to do the main steps are signs, packaging, transportation, storage.
PVC pipe fittings shall not be less than two permanent mark.
Mark should at least include the following contents: product name should be marked: (PVC-C) (PVC-U) non drinking water or drinking water; size: nominal pressure, nominal diameter and wall thickness of the site; production plant; the standard number; the production date and so on, is the main parts, one should basically understand.
Packaging: according to customer requirements, according to customer requirements for different packaging, but also have to take into account whether the packaging of the pipe fittings with the role of protection.
Transport: pipe during transportation, not exposure, stain, stress and damage; protective measures must be skilled in the transport process.
Storage: the pipe should be reasonably stacked, away from the heat source. Stacking height does not exceed 1.5m. Expanded mouth parts staggered to avoid extrusion deformation, when the open storage, must be covered to prevent exposure.
Shijiazhuang xing yin import and export trading Co.,Ltd
Address
5C,Diaoyutai palace,Jiankang Road,Changan District,shijiazhuang CityTel:86-0311-86051722
Fax:86-0311-86051722
Whatsapp/Mob:86-15533994368

Email:david@pvcfittingssupplier.com
Skype:live:davidxingyin
www.pvcfittingssupplier.com

没有评论:

发表评论