After the PPR pipe fittings factory construction is completed, it is necessary for its acceptance, every aspect should be in line with the standard, to ensure that it is safe to use.
1, it is necessary to conduct testing of each part, and look at the construction drawings are not consistent, or have not cut corners.
2, to check the PPR pipe pipe fittings have no debris, in order to avoid the water pressure test, the debris in the pipeline collision caused by cracks, if so, after the use of the process will occur.
3, but also to check the parts and equipment is not completely hot melt with the pipe, a lot of accidents are in the hot melt interface burst.
In addition, the PPR pipe fittings need to use the support of the support of the place, but also to check the stent is not stable enough and strong.
Shijiazhuang xing yin import and export trading Co.,Ltd
Address:5C,Diaoyutai palace,Jiankang Road,Changan District,shijiazhuang City
Tel:86-0311-86051722
Fax:86-0311-86051722
Mob:86-15533994368
Address:5C,Diaoyutai palace,Jiankang Road,Changan District,shijiazhuang City
Tel:86-0311-86051722
Fax:86-0311-86051722
Mob:86-15533994368
Email:david@pvcfittingssupplier.com
Skype:live:davidxingyin
Skype:live:davidxingyin
www.pvcfittingssupplier.com
没有评论:
发表评论