2016年10月31日星期一

Welding repair method of PVC drainage fittings

Welding repair method of PVC drainage fittings
PVC drainage accessories if there is water leakage, you can choose to use the welding repair method. In the welding time to pay attention to ensure that the welding parts dry, while cleaning the surface of the dust, oil and other oils and fats, in the bonding interface welding repair, the adhesive must be removed clean welding.
PVC drainage parts Road and pipe fittings in the structural safety conditions do not affect the slight leakage, can be used PVC-U welding repair welding, ambient temperature is not less than 5 degrees celsius. Using multi-layer welding, to cool down after a period of time, and then the next layer of welding. Welding, the need to maintain appropriate temperature and pressure, the hot air temperature should be 260 degrees Celsius -290 degrees celsius. Overheating is easy to deform or carbonization, and the pressure is too high may cause the cracking of the weld after cooling.
If PVC is because the drainage fittings Dingfan apron or pipe to replace damaged pipe, the pipe should be cut off. The following 160 diameter pipeline, heat socket can be taken on-site repair, the two ends of the pipeline sawing up, both sides for chamfering. Interception of a replacement tube, will replace the ends of the tube after heating and insert cut off both ends of the pipeline and put into the ditch, then after cooling.
Flange fast docking, PVC road drainage fittings replacement parts cut ends hit groove. Take the joint four, the replacement of a section of the pipe. Four socket joints are sheathed in the two ends of the replacement pipe and cut off the PVC drainage parts at both ends, and the replacement of the set of socket joint and a good socket connector of the broken pipe flange connection.
The fast joint top double apron expansion or damaged oral sawing. Both ends of the broken pipe are sheathed with a movable sleeve flange and a rubber ring. The broken pipe flat back flange sleeve, the distance equal in broken tube ends, will looper flange and the flange sleeve with bolts.

Shijiazhuang xing yin import and export trading Co.,Ltd
Address:5C,Diaoyutai palace,Jiankang Road,Changan District,shijiazhuang City
Tel:86-0311-86051722
Fax:86-0311-86051722
Mob:86-15533994368
 
Email:david@pvcfittingssupplier.com
Skype:live:davidxingyin
www.pvcfittingssupplier.com

Why do PVC drainage fittings tan?--Pvc fittings and pipe supplier and manufacturer - A best pvc fittings supplier and manufacturer in china

Why do PVC drainage fittings tan?--Pvc fittings and pipe supplier and manufacturer - A best pvc fittings supplier and manufacturer in china

2016年10月30日星期日

PVC-U tube how to pass through the low-lying areas

PVC-U tube how to pass through the low-lying areas
The foundation of PVC-U pipeline must have enough bearing capacity and reliable stability, otherwise, the uneven settlement of foundation will cause the wrong port, fracture, leakage and other phenomena of PVC-U pipeline. For soft soil foundation, miscellaneous fill soil foundation and so on, should take the foundation treatment measures, can refer to the standard: "water supply and drainage pipeline engineering construction acceptance code" GB 50268. Specific design should be carried out by the professional design department to ensure the safety of pipeline operation. According to the specific circumstances should be done as follows:
1, the foundation pit filling layer paved bottom, upper part of the compacted layer, then laying concrete foundation beneath PVC-U pipeline trench.
2, PVC-U pipeline crossing the Gouyan parts should add transition protection measures, such as the use of multiple short 0.8-1.0 meters transition, or casing protection.


Shijiazhuang xing yin import and export trading Co.,Ltd
Address:5C,Diaoyutai palace,Jiankang Road,Changan District,shijiazhuang City
Tel:86-0311-86051722
Fax:86-0311-86051722
Mob:86-15533994368
Email:david@pvcfittingssupplier.com
Skype:live:davidxingyin
www.pvcfittingssupplier.com

Performance analysis of mesh structure of PvCO pipe--Pvc fittings and pipe supplier and manufacturer - A best pvc fittings supplier and manufacturer in china

Performance analysis of mesh structure of PvCO pipe--Pvc fittings and pipe supplier and manufacturer - A best pvc fittings supplier and manufacturer in china

2016年10月27日星期四

How to improve the efficiency of PPR pipe fittings drainage pipeline

How to improve the efficiency of PPR pipe fittings drainage pipeline
In the use of PPR pipe fittings, bonding before the test is to be assembled, today, small make up for you to introduce how to improve the efficiency of PPR pipe fittings drainage pipe:
First of all, after taking length determination in PPR pipe fittings, can be hand cut with a hacksaw saw or saw blade sawing, sawing machine. Then, each layer of vertical pipe expansion joint installed one, and to compensate the countercurrent tube expansion. Again, in the installation of three links to the attention of downstream direction, to facilitate the installation of horizontal tube when the natural slope of each storey riser within 3M, consider setting up a hoop. In addition, the horizontal pipe, drainage pipe line distance should be in line with the provisions, but also should be set to check the mouth or mouth cleaning.
Above is to improve the efficiency of PPR pipe fittings and drainage pipeline related knowledge, we hope to be able to help.
Shijiazhuang xing yin import and export trading Co.,Ltd
Address:5C,Diaoyutai palace,Jiankang Road,Changan District,shijiazhuang City
Tel:86-0311-86051722
Fax:86-0311-86051722
Mob:86-15533994368
 
Email:david@pvcfittingssupplier.com
Skype:live:davidxingyin
www.pvcfittingssupplier.com

PPR pipe fittings of the fusion point why the leakage occurs--Pvc fittings and pipe supplier and manufacturer - A best pvc fittings supplier and manufacturer in china

PPR pipe fittings of the fusion point why the leakage occurs--Pvc fittings and pipe supplier and manufacturer - A best pvc fittings supplier and manufacturer in china

2016年10月26日星期三

PPR pipe fittings construction completed testing standards

PPR pipe fittings construction completed testing standards
After the PPR pipe fittings factory construction is completed, it is necessary for its acceptance, every aspect should be in line with the standard, to ensure that it is safe to use.
1, it is necessary to conduct testing of each part, and look at the construction drawings are not consistent, or have not cut corners.
2, to check the PPR pipe pipe fittings have no debris, in order to avoid the water pressure test, the debris in the pipeline collision caused by cracks, if so, after the use of the process will occur.
3, but also to check the parts and equipment is not completely hot melt with the pipe, a lot of accidents are in the hot melt interface burst.
In addition, the PPR pipe fittings need to use the support of the support of the place, but also to check the stent is not stable enough and strong.
Shijiazhuang xing yin import and export trading Co.,Ltd
Address:5C,Diaoyutai palace,Jiankang Road,Changan District,shijiazhuang City
Tel:86-0311-86051722
Fax:86-0311-86051722
Mob:86-15533994368
 
Email:david@pvcfittingssupplier.com
Skype:live:davidxingyin
www.pvcfittingssupplier.com

Outstanding problems in the PPR pipe fittings on the market--Pvc fittings and pipe supplier and manufacturer - A best pvc fittings supplier and manufacturer in china

Outstanding problems in the PPR pipe fittings on the market--Pvc fittings and pipe supplier and manufacturer - A best pvc fittings supplier and manufacturer in china

2016年10月25日星期二

The calculation method of roof gutters

The calculation method of roof gutters
Roofing downpipe layout and roof catchment area size, the maximum hourly rainfall, drainage tube diameter and other factors. Can be calculated by the following formula:
F=438D - /H
Type: F- single catchment area (downpipe allowed level projection area, m)
D- (cm, the square downpipe diameter area can be converted)
H- maximum rainfall per hour (mm/h, provided by the local meteorological department)
In engineering practice, the distance between the roof gutters (gutter water distance) should be 10-15m. When calculating the spacing is greater than the applicable space, should be set according to the applicable distance when calculating the downpipe; spacing is less than the applicable distance, according to the calculation interval setting downpipe.
Shijiazhuang xing yin import and export trading Co.,Ltd
Address:5C,Diaoyutai palace,Jiankang Road,Changan District,shijiazhuang City
Tel:86-0311-86051722
Fax:86-0311-86051722
Mob:86-15533994368
 
Email:david@pvcfittingssupplier.com
Skype:live:davidxingyin
www.pvcfittingssupplier.com

UPVC spiral drainage accessories application needs to pay attention to the problem--Pvc fittings and pipe supplier and manufacturer - A best pvc fittings supplier and manufacturer in china

UPVC spiral drainage accessories application needs to pay attention to the problem--Pvc fittings and pipe supplier and manufacturer - A best pvc fittings supplier and manufacturer in china

2016年10月24日星期一

What are the standards for the design of a square rain water pipe?

What are the standards for the design of a square rain water pipe?
The application of square rain water pipe in our lives more and more widely, and its design is directly related to the quality of the construction, so what are the standard square rain water pipe in the design? Let's see it!
Storm intensity, is refers to the rainfall process, a continuous period of rainfall
2 drainage area, a square pipe to collect rainwater in rain area.
The 3 bottom surface catchment time, refers to the water to reach the starting point from the time of discharge pipe boundaries.
4 runoff coefficient is the ratio of rain water and total amount of rain water flowing into the pipeline.
5 the return period of the rainstorm is the average time interval of the occurrence of the rainstorm intensity equal to or greater than the prescribed time.
www.pvcfittingssupplier.com

Construction procedure of square rain water pipe--Pvc fittings and pipe supplier and manufacturer - A best pvc fittings supplier and manufacturer in china

Construction procedure of square rain water pipe--Pvc fittings and pipe supplier and manufacturer - A best pvc fittings supplier and manufacturer in china

2016年10月13日星期四

Pipeline connecting ring type and card type what is the difference?

Pipeline connecting ring type and card type what is the difference?
PVC pipe ring pressure connection, is a kind of cold extrusion by means of pipes and pipe fittings connection sealing way, it is the bell will advance a sealing ring pipe insert, from the external connection section of the socket to put pressure on the week. Pressing, connection socket together with the insertion of the pipe together under the concave deformation after locking the lock, so as to realize the effective connection method of sealed pipes and fittings.
1 compression ring joint
The ring pressure connecting pipe is inserted into the socket of the pipe with a rectangular sealing ring in advance, and the stable section and the sealing section of the socket are pressed by the outside. Pressing, stable segment socket insert pipe together with concave deformation after being locked with locking; movement and deformation in the cavity to fully fill the gap between the pipe and pipe sealing material makes the pressure of the sealing section at both ends, so as to achieve effective sealing pipe and fittings.
2 card type connection
Card type is connected with the sealing ring socket pipe connecting pipe, with special tool press and a pipe connection sealing and fastening function. The basic composition of press fitting is a special shape at the end of >U type O type sealing ring is arranged in the groove of the pipe connector. When assembled, the stainless steel pipe is inserted into the pipe, using special tool pressure seal sealing pressure, sealing pipe, pressure part of the tube is extruded into hexagonal, thus forming the corresponding connection strength, at the same time as the ring compression deformation of the sealing function. The pipe fitting cost is low, the project installation is simple, the construction speed is quick.
www.pvcfittingssupplier.com

The information of these PE tubes is wrong.--Pvc fittings and pipe supplier and manufacturer - A best pvc fittings supplier and manufacturer in china

The information of these PE tubes is wrong.--Pvc fittings and pipe supplier and manufacturer - A best pvc fittings supplier and manufacturer in china

2016年10月12日星期三

Avoid the 3PE anticorrosive layer tube side appear warped edge of what measures?

Avoid the 3PE anticorrosive layer tube side appear warped edge of what measures?
Three layer polyethylene coating (3PE) has excellent comprehensive properties of fusion bonded epoxy powder coating and extrusion two polyethylene anticorrosive coating, interfacial properties of fusion bonded epoxy powder coating and chemical resistance properties, combined with polyethylene coating extrusion mechanical protection characteristics, thereby significantly improving their performance. Therefore, the outer protective layer of the buried pipeline is very superior. Three layer PE can make the life of the buried pipeline up to 50 years, at present, in the world is considered to be the most advanced pipeline external corrosion protection technology. In China, the three tier PE has been the first to be applied in the oil and gas system. Chinese has built the Shaanxi Beijing gas pipeline and Korla Shanshan oil pipeline, the recent national key project west east gas pipeline nearly 4000 kilometers are adopted three layers of PE external coating.
1 epoxy powder coating is reserved only to protect the integrity, in order to delay the pipe end due to corrosion caused by the edge of the. With the wire wheel grinding way of domestic polyethylene pipe end groove processing, can damage the epoxy powder coating. Should use mechanical chamfering edge to the bottom, the cutting depth limiting device to control the tool, so as not to hurt the epoxy powder coating.
2 without affecting the mouth welding conditions, should be appropriate to increase the reserve length polyethylene layer end epoxy powder, can prevent steel long stack, 3PE anticorrosive pipe end metal corrosion caused by alice.
3 strict control of the pipe end of the weld residual high repair quality. In the weld slope and the pipe body as polyethylene outside the other parts, the epoxy powder retention length >20mm, to prevent Weld Epoxy Corrosion Caused by bottom first 3PE anticorrosion layer alice.
4 anti-corrosion pipe in the open air for a long time, should be covered at the pipe end to prevent rain erosion, resulting in serious corrosion of the pipe.
5 if the pipeline site construction period is longer, can be in the tube end metal exposed to paint can be welding rust proof paint, in order to prevent corrosion protection pipe in the storage period due to corrosion caused by 3PE anti corrosion layer edge.
www.pvcfittingssupplier.com

what Connection PE pipe fittings need to pay attention --Pvc fittings and pipe supplier and manufacturer - A best pvc fittings supplier and manufacturer in china

what Connection PE pipe fittings need to pay attention --Pvc fittings and pipe supplier and manufacturer - A best pvc fittings supplier and manufacturer in china

2016年10月11日星期二

PVC pipe fittings after the production of the work

PVC pipe fittings after the production of the work
After successful PVC pipe production, has been tested and qualified, what to do after the PVC pipe production success, the need to do the main steps are signs, packaging, transportation, storage.
PVC pipe fittings shall not be less than two permanent mark.
Mark should at least include the following contents: product name should be marked: (PVC-C) (PVC-U) non drinking water or drinking water; size: nominal pressure, nominal diameter and wall thickness of the site; production plant; the standard number; the production date and so on, is the main parts, one should basically understand.
Packaging: according to customer requirements, according to customer requirements for different packaging, but also have to take into account whether the packaging of the pipe fittings with the role of protection.
Transport: pipe during transportation, not exposure, stain, stress and damage; protective measures must be skilled in the transport process.
Storage: the pipe should be reasonably stacked, away from the heat source. Stacking height does not exceed 1.5m. Expanded mouth parts staggered to avoid extrusion deformation, when the open storage, must be covered to prevent exposure.
Shijiazhuang xing yin import and export trading Co.,Ltd
Address
5C,Diaoyutai palace,Jiankang Road,Changan District,shijiazhuang CityTel:86-0311-86051722
Fax:86-0311-86051722
Whatsapp/Mob:86-15533994368

Email:david@pvcfittingssupplier.com
Skype:live:davidxingyin
www.pvcfittingssupplier.com

Material properties of PVC pipe with high impact resistance--Pvc fittings and pipe supplier and manufacturer - A best pvc fittings supplier and manufacturer in china

Material properties of PVC pipe with high impact resistance--Pvc fittings and pipe supplier and manufacturer - A best pvc fittings supplier and manufacturer in china

2016年10月10日星期一

Repair method of PVC pipe drainage pipe leakage

Repair method of PVC pipe drainage pipe leakage
PVC pipe is widely used in the family, but in the kitchen, toilet, balcony through the concrete floor, it is often because of hot and cold climate temperature pipeline gap, large flow drainage vibration and make PVC pipe cracks, more obvious leakage, it has become a common problem plagued the minds of people. Below, by professional manufacturers to introduce you to repair the PVC drainage pipe leakage method.
In order to solve the leakage of the PVC pipe fittings over the concrete floor, a new type of patent production - the end of leakage section has been invented. Stop festival to fill the original leakage check reform method is easy to aging, variable type, poor sealing effect, with a one-time installation, pore plugging, convenient, material saving, etc.. It can not only complete the leakage, but also can discharge the floor drain, with reliable technology, durable, low construction cost and so on. And the performance of the check and drain section is stable and reliable, and the cost of replacing the PVC pipe fittings and the service life of the product are reduced.
Above is the expert to introduce you to repair the PVC drainage pipe leakage of knowledge, hope to be helpful to your daily life!
Shijiazhuang xing yin import and export trading Co.,Ltd
Address
5C,Diaoyutai palace,Jiankang Road,Changan District,shijiazhuang CityTel:86-0311-86051722
Fax:86-0311-86051722
Whatsapp/Mob:86-15533994368

Email:david@pvcfittingssupplier.com
Skype:live:davidxingyin
Website:www.pvcfittingssupplier.com

Water pressure test and disinfection method for PVC pipe fittings--Pvc fittings and pipe supplier and manufacturer - A best pvc fittings supplier and manufacturer in china

Water pressure test and disinfection method for PVC pipe fittings--Pvc fittings and pipe supplier and manufacturer - A best pvc fittings supplier and manufacturer in china

2016年10月9日星期日

PVC pipe to solve the problem of sewer blockage

PVC pipe to solve the problem of sewer blockage
Living in a modern city, living in the building inside, every day is surrounded by reinforced concrete, always think it is safe, in fact, there are problems, sewer obstruction is a common problem.
Why is the sewer blocked, because the use of traditional steel cast iron pipe, corrosion resistance is poor, for a long time, the corrosion will be bumpy, it provides a chance for those particles in daily life rubbish inside, because if the pipe is a smooth, does not block the sewer. For this reason, the current housing decoration more and more to the drainage pipe using PVC fitting, because it is made of PVC resin as the main raw material for plastic products, plastic products, there is no corrosion problem, will not happen drains.
Of course, have a good advantage of PVC pipe in the compressive strength, impact performance, depending on the polymer, the seemingly fragile plastic in a thin layer in the aggregation of dozens of layers, even by fire, will not easily broken, so in the future use of PVC as a drainage pipe fittings, will become the preferred materials sewer laying.
Shijiazhuang xing yin import and export trading Co.,Ltd
Address:5C,Diaoyutai palace,Jiankang Road,Changan District,shijiazhuang City
Tel:86-0311-86051722
Fax:86-0311-86051722
Whatsapp/Mob:86-15533994368
 
Email:david@pvcfittingssupplier.com
Skype:live:davidxingyin
www.pvcfittingssupplier.com

solve the black rhyolite PVC pipe--Pvc fittings and pipe supplier and manufacturer - A best pvc fittings supplier and manufacturer in china

solve the black rhyolite PVC pipe--Pvc fittings and pipe supplier and manufacturer - A best pvc fittings supplier and manufacturer in china

2016年10月8日星期六

What is the difference between UPVC pipe and PVC pipe fittings

What is the difference between UPVC pipe and PVC pipe fittings
UPVC pipe fittings, pipe has the advantage of light: UPVC material proportion of only cast iron 1/10, transport, installation simple, reduce costs.
Superior anti chemical properties: UPVC has excellent anti acid and alkali resistance, in addition to close to saturation point strong acid base or strong agents atmaximun Oxidising.
Non conductive: UPVC material can not be conductive, nor by the electrolysis, the current corrosion, should not be two times the processing. Does not burn, nor fire combustion, no worries. Easy installation, low cost: cutting and connecting are very simple, using PVC glue to join practice to prove reliable and safe, easy to operate, low cost. Durable: excellent anti climate, also cannot be corrupted by bacteria and fungi. Small resistance, high flow rate: the inner wall is smooth, fluid flow loss is small, the dirt is not easy to adhere to the smooth wall, maintenance is relatively simple, low maintenance costs.
PVC pipe fittings: PVC is polyvinyl chloride, is a kind of plastic products produced by 43% of oil and 57% of salt. Compared with other kinds of plastic products, PVC is more effective use of raw materials, reduces fuel consumption. At the same time, the energy consumption of PVC manufacturing industry is also very low. And in the late stage of the use of PVC products, can be recovered and converted to other new products or burned to get energy.
PVC in the production will be added to the stabilizer, but the stabilizer is non-toxic and toxic, only by adding a lead salt and the like of toxic stabilizers, will produce hidden dangers. But the PVC product of some small businesses to use dragons and fishes jumbled together, lead salt stabilizer, it is difficult to reach the relevant health standard. Consumers in the choice of PVC materials, it is best to a regular credit to ensure the quality of building materials market to buy, and require the supplier to issue inspection report. Consumers should pay attention to view the relevant documents and signs, to obtain the health permit for drinking water health safety products, the product is safe
Shijiazhuang xing yin import and export trading Co.,Ltd
Address:5C,Diaoyutai palace,Jiankang Road,Changan District,shijiazhuang City
Tel:86-0311-86051722
Fax:86-0311-86051722
Whatsapp/Mob:86-15533994368
 
Email:david@pvcfittingssupplier.com
Skype:live:davidxingyin
www.pvcfittingssupplier.com

Knowledge and formula of PVC drainage pipe--Pvc fittings and pipe supplier and manufacturer - A best pvc fittings supplier and manufacturer in china

Knowledge and formula of PVC drainage pipe--Pvc fittings and pipe supplier and manufacturer - A best pvc fittings supplier and manufacturer in china